. .

Invest in your success.
JVRA helps lawyers win cases by providing critical information you can use to establish precedent, determine demand and win arguments.

ARTICLE ID 29249

$________ - CONSTRUCTION SITE NEGLIGENCE- WOOD BLOCK DRIVEN INTO FEMUR - MULTIPLE COMMINUTED FRACTURES OF RIGHT FEMUR.

Los Angeles County, California

The 49-year-old male plaintiff was employed as a crane oiler for a crane company working at the construction site. A ________ pound preheater fell onto a wood block that the plaintiff was positioning driving the wood into the plaintiff’s femur.

The plaintiff was working in his capacity as a crane oiler at a construction site. The defendant, Air Products and Chemicals, operated a hydrogen production plant and had hired the defendant Saxon Group to replace preheater units that were components of the production plant. The defendant Saxon was responsible for removing old preheater units weighing ________ pounds and installing new preheater units weighing ________ pounds. The defendant Benelux-Apex sold the preheater units to the defendant Air Products. The defendant Air Products hired the plaintiff’s employer, Maxim Crane to supply the required cranes necessary to move the preheaters.

The old preheaters were picked-up by lifting lugs that were bolted onto the old preheater units specifically for the removal process. The defendant Air Products and the defendant Saxon Group took the lifting lugs off the new ________ pound preheaters and bolted them to the old preheaters weighing ________ pounds so that the old preheaters could be lifted for removal. During this removal process, the lifting lug bolts stripped off the nuts causing the preheater to fall. It landed on a block of wood that the plaintiff was positioning. The force of the impact drove the wood into the plaintiff’s right femur fracturing it. The plaintiff contended that the defendants were negligent in that the nuts and bolts used to secure the lifting lugs had been mismatched. The plaintiff contended that 22mm nuts were attached to 20mm bolts. As a result of this incident, the plaintiff suffered multiple comminuted bicondylar fracture of the right p 7 3 femur.

The defendants maintained that the nuts and bolts utilized were mismatched by the manufacturer of the preheaters.

The plaintiff demanded the sum of $________. The defendants offered $________. After a thirteen-day trial and two days of deliberations the jury found in favor of the plaintiff and against the defendants. The jury assessed liability as 70% to defendant Saxon, 30% to defendant Air Products and 0% to defendant Benelux. The jury awarded the total of $________ consisting of $________ in past general damages; $________ in future general damages; $________ in past economic damages and $________ in future economic damages.

To read the full article, please login to your account or purchase

5 ways to win with JVRA

JVRA gives you jurisdiction-specific, year-round insight into the strategies, arguments and tactics that win. Successful attorneys come to the table prepared and use JVRA to:

  1. Determine if a case is winnable and recovery amounts.
  2. Determine reasonable demand for a case early on.
  3. Support a settlement demand by establishing precedent.
  4. Research trial strategies, tactics and arguments.
  5. Defeat or support post-trial motions through past case histories.

Try JVRA for a day or a month, or sign up for our deluxe Litigation Support Plan and put the intelligence of JVRA to work for all of your clients. See our subscription plans.